tgp

tgp

 英

  • 網絡白芍總苷(total glucosides of paeony);白芍總甙;帕夫林

例句

The paper has analyzed the dynamometer monitoring result of high slope anchor cable of TGP double-line five-grade ship lock.

本文三峽工程船閘邊坡測力計監測資料進行分析

The flood control benefit of the TGP is the greatest contribution to the improvement of the eco-environment in the middle and lower reaches.

三峽工程防洪效益長江中下游生態環境得以改善最大貢獻

This paper researches the reasons of TGP s banquette slumping during river closure by the Catastrophe theory and Self organized criticality.

突變理論組織臨界性理論三峽大江截流坍塌機理進行研究

The TGP is scheduled to expire at the end of this year, leaving solar projects high and dry.

TGP預計今年年底到期屆時太陽能發電項目再次陷入無助困境

Objective To observe the effect of total glucosides of paeony (TGP) combined with methotrexate (MTX) on rheumatoid arthritis (RA).

目的觀察白芍TGP聯合蝶呤MTX治療類風濕關節炎RA療效

With water extraction and gel filtration purification, a kind of polysaccharide protein conjugate, TGP(Tea Glycoprotein), was prepared.

用水提取茶葉采用純化茶葉分離得到一種多糖蛋白復合物TGP

It took nearly 100 years from conception, demonstration, design, construction and operation to final completion of TGP.

三峽工程構想論證設計建設竣工全面投入運行歷時百年

The unsteady changes of seepage field of slope of TGP ship lock under raining and percolation are analyzed by saturated seepage model.

采用飽和滲流模型降雨條件三峽船閘邊坡滲流穩態變化情況進行分析

We observed the sheet-like processes typical morphology of DCs stimulated by TGP.

細胞TGP誘導刺激細胞形態越發典型

By using the sonic wave and the seismic wave, the foundation rock holding layer on-spot testing of TGP has been performed.

應用聲波地震三峽工程基建基巖進行現場檢測

It is proved that one year ahead of the original schedule for the third-stage engineering construction of TGP is feasible.

最后結果表明三峽工程施工提前可行

Research on properties of wet-ground fine cement slurry used for foundation grouting of TGP under high pressure

三峽工程基礎灌漿高壓泥漿性能研究

Selection and Verification of the Structural Pattern of the Penstock and Spiral Case of the TGP Power-station

三峽工程水電站壓力管道技術結構型式選擇論證

Prototype observation on navigation hydraulics in diversion channel of TGP during construction period and its verification on model

三峽導流明渠施工通航原型觀測模型驗證

Hydraulic calculation for TGP second stage cofferdam construction during flood period and its actual verification

三峽工程圍堰截流汛期水力學計算

Analysis on river bed evolution of dam area from the main river closure to open diversion channel closure of TGP

三峽工程大江明渠截流期間分析

Research on installing a soft cushion layer for placing concrete surrounding the spiral case of TGP powerplant

三峽電站敷設軟墊澆筑外圍混凝土研究

Concrete construction technology for spiral case of TGP power source station's main powerhouse

三峽電源電站廠房混凝土施工技術

Optimization study on the length of upstream floating guide wall of TGP's shiplift

三峽升船上游導航長度優化研究

Reversion analysis of anti-shearing strength parameters of a landslide in TGP reservoir area

三峽滑坡強度參數分析

Influence of TGP impoundment on flowing time of the Yangtze river to the estuary

三峽水庫蓄水長江進入河口流量時間影響

Seepage prevention wall constructed with high pressure jetting for stage I separation levee and its cofferdam at TGP

三峽船閘下游流堤施工圍堰施工

Research on water temperature variation of TGP reservoir before and after impoundment and its influence

三峽水庫蓄水前后下泄水溫變化及其影響研究

Threat on Bank of Hanjiang River due to the Impounding Water of TGP and Its Countermeasures

三峽水庫蓄水漢江堤防安全威脅防御對策

The research of the navigation and diversion in TGP channel and its numerical simulation

三峽工程明渠導流通航數值實驗研究概述

Construction equipment allocation for high intensity backfilling construction of upstream separation levee of TGP

三峽上游流堤高強度填筑施工設備配置

10 Years of supervision on TGP construction of the Yangtze river

長江三峽工程建設監理10實踐

Preliminary analysis of uncertainty in quantitative precipitation forecast of TGP reservoir interval area

三峽水庫區間定量降水預報不確定性初探

Significant Decision for Constructing TGP--Review of Three-Generation Leaders of the CPC Showed Concern for Constructing TGP

三峽工程建設重大決策--三代領導人關懷三峽工程建設回顧

Preliminary analysis on supervision data of foundation deformation of TGP Shiplift during construction period

三峽工程升船施工期基礎變形監測初步分析

Three-dimensional Nonlinear Finite-Element Analysis on Directly Embedded Spiral Case Model of TGP Hydroelectric Power Plant

三峽電站埋式結構試驗模型非線性有限分析

On establishment of hydrologic and meteorological information network station of open diversion channel closure of TGP

三峽工程明渠截流水文氣象信息網站建設

Analysis on additional deformation of longitudinal joint of flood release monoliths of TGP dan due to grouting

三峽泄洪灌漿后增開變形分析研究

Experimental study on navigable condition in and outside the inlet zone of approach channel for TGP temporary shiplock

三峽臨時船閘引航河段通航條件試驗研究

Key-Technologies Tackling on High Slope of TGP Permanent Lock and Its Effect in Design Optimization

三峽工程永久船閘邊坡科技攻關及其布置方案優化成效

Preliminary analysis of resettlement supervision information management of TGP

淺析三峽工程移民監理信息管理

Flood control situation in middle and lower area of the Yangtze river after TGP completion and countermeasures

三峽工程建成長江下游防洪形勢對策

Research on flow-induced vibration and its control for radial gate of TGP diversion bottom outlets

三峽導流弧形閘門泄洪振動控制研究

Design of second stage concrete placement facilities with controlled pressure and temperature for TGP power station's spiral case

三峽電站保溫混凝土裝置設計

Design of a conceptual model for TGP upstream approaching channel

三峽樞紐上游航道模型試驗裝置設計