螢?zāi)?/c>的電容器當(dāng)作零件之一。
Managers need to be aware of the FMEA tasks their staff are to perform and how much time these tasks will take.
管理者需要了解其成員所要進(jìn)行的FMEA工作,以及做這些工作需要花多少時(shí)間。
That did not happen They failed to do a full Failure Mode Effects Analysis (FMEA).
這沒(méi)有發(fā)生他們沒(méi)有做一個(gè)完整的故障模式影響分析(FMEA)。
As the last and propulsive stage of TFT-LCD new product R & D, product evaluation business is of great importance in FMEA application.
產(chǎn)品評(píng)價(jià)業(yè)務(wù)作為TFT-LCD新產(chǎn)品研發(fā)的把關(guān)與推進(jìn)環(huán)節(jié),如何應(yīng)用FMEA,意義尤為重要。
The concept of FMEA and its application in maintenance management of equipment are explained in detail.
對(duì)故障模式及影響分析(FMEA)的概念及在設(shè)備維修管理中的具體應(yīng)用作了較為詳盡的闡述。
Finally, this thesis summarizes the actual application result of FMEA, illustrates it from direct and indirect benefit respectively.
最后,本文對(duì)FMEA實(shí)際應(yīng)用結(jié)果進(jìn)行了總結(jié),分別從直接效益和間接效益兩方面進(jìn)行闡述。
Reason: We did not put the measures of FMEA into practice and related documents.
原因:沒(méi)有把FMEA的措施落實(shí)到相關(guān)文件和實(shí)際操作中。
FMEA is potentially one of the most beneficial and productive tasks in a well- structured reliability program .
在完善架構(gòu)具可靠性的計(jì)劃中,FMEA是最具效益和生產(chǎn)力的作業(yè)之一。
Expectations and deliverables. FMEA team members will have multiple responsibilities and reporting structures.
期望和可以做到的事:FMEA小組成員有多種的責(zé)任和報(bào)告架構(gòu)。
FMEA can be used to prioritize risks and monitor the effectiveness of risk control activities.
FMEA可用來(lái)安排風(fēng)險(xiǎn)的優(yōu)先順序,監(jiān)控風(fēng)險(xiǎn)控制活動(dòng)的有效性。
Assist the Design Manager and Engineering in quoting, DFA, FMEA, design progress assessment, and continuous improvement of design standards.
協(xié)助設(shè)計(jì)部經(jīng)理和工程部在報(bào)價(jià),DFA,F(xiàn)MEA,設(shè)計(jì)過(guò)程評(píng)估,以及不斷改進(jìn)的設(shè)計(jì)工作標(biāo)準(zhǔn)等事宜。
At the same time, modules of the system failure mode and effect analysis, FMEA report form, which as a Fault Tree added and improved.
同時(shí)對(duì)系統(tǒng)模塊進(jìn)行故障模式影響分析,形成FMEA報(bào)告,這作為對(duì)故障樹(shù)的補(bǔ)充和完善。
This article brings forward an algorithm which combines the stratification algorithm with the FMEA (Failure Mode and Effect Analysis).
本文提出了一種將分層算法與故障模式及后果分析法相結(jié)合的算法。
FMEA can be used to identify potential failure modes and determine their impacts.
FMEA可用來(lái)識(shí)別潛在的故障模式,確定其影響。
Alignment with separate instructions for each sensor, FMEA through testing to ensure the reliability of the control.
每對(duì)傳感器配備單獨(dú)的對(duì)準(zhǔn)指示,通過(guò)FMEA測(cè)試,保證了控制的可靠性。
To improve product quality continuously with the input from process capability analysis, FMEA, customer feedback, etc.
通過(guò)過(guò)程能力分析,FMEA,客戶投訴等有效手段持續(xù)改進(jìn)產(chǎn)品質(zhì)量;
FMEA methodically breaks down the analysis of complex processes into manageable steps.
FMEA將復(fù)雜的工藝系統(tǒng)地分解為簡(jiǎn)單的步驟。
Understand how a FMEA can be used to predict and prevent problems before they occur.
如何利用FMEA來(lái)預(yù)報(bào)及防止問(wèn)題來(lái)預(yù)報(bào)及防止問(wèn)題如何利用
Good knowledge as CAM and CAD, CNC process and programming specially, know accessory FMEA analyze and relative standard file.
熟悉CAM和CAD技術(shù),尤其是鈑金零件的設(shè)計(jì)和CNC加工工藝及數(shù)控編程,熟悉零部件的失效分析及相關(guān)標(biāo)準(zhǔn)的查詢使用。
The control plan for PRE-launch and production shall take into account the design FMEA and manufacturing process FMEA outputs.
在試生產(chǎn)和生產(chǎn)階段的控制計(jì)劃中要考慮設(shè)計(jì)FMEA和制造過(guò)程FMEA輸出。
Overall responsible for all molding process documents maintain, PFMEA update and optimization.
負(fù)責(zé)整個(gè)注塑制程的文件維護(hù),過(guò)程FMEA的更新和優(yōu)化。
With this model, the FMEA of a micro-electronic equipment is analyzed and it shows the develop. . .
通過(guò)對(duì)微電子裝備的研發(fā)進(jìn)行分析,該模型能明顯地克服產(chǎn)品研發(fā)中的風(fēng)險(xiǎn)。
Is the Design FMEA or similar quality tools available with improvement measures in place and updated regularly?
是否採(cǎi)用失效模式因果分析或類似的品質(zhì)工具?是否定期更新?
Additional appendices include example forms and special case applications of FMEA.
增加各種附錄,包括各種實(shí)用的表格和特定案例的應(yīng)用實(shí)例。
Familiar with quality control and management, including techniques like SPC, FMEA, etc.
熟悉質(zhì)量管理控制,包括。
Are instructions from the design FMEA regarding process based actions further observed?
基于潛在失效模式產(chǎn)生的指導(dǎo)手冊(cè)是否認(rèn)為措施還需要觀察?
All of the lessons learned are not communicated to operator, and feed back to FMEA, CP and WI.
現(xiàn)場(chǎng)所獲得的經(jīng)驗(yàn)教訓(xùn)未有效傳達(dá)到員工,并未反饋到FMEA,控制計(jì)劃和作業(yè)指導(dǎo)書(shū)中。
Process flow diagram, duly numbered for each operation (co-relate with FMEA & control plan).
過(guò)程流程圖(工位編號(hào)與FMEA和控制計(jì)劃一致)
The Six Sigma Black Belt will demonstrate the ability to read an FMEA analysis.
西格瑪黑帶應(yīng)能示范其理解FMEA分析的能力。
Were customer plant problems used as an aid in developing the Process FMEA?
工業(yè)客戶的問(wèn)題是否用來(lái)協(xié)助開(kāi)發(fā)工序故障類型和影響分析?
Support production line for problem solving, FMEA, process control, etc.
支持生產(chǎn)部門解決問(wèn)題,進(jìn)行失效模式分析和工藝控制;
Was warranty information used as an aid in developing the Process FMEA?
保修信息是否用來(lái)協(xié)助開(kāi)發(fā)工序故障類型和影響分析?
Follow the improvement actions defined in FMEA report and avoid issue recurrence.
跟進(jìn)相關(guān)部門的改善行動(dòng),避免類似問(wèn)題重新發(fā)生。
Conclusion FMEA is effective in the prevention of slippage of central venous catheter.
結(jié)論FMEA應(yīng)用于中心靜脈導(dǎo)管脫管中能有效降低其脫管率。
Conduct FMEA, Reliability analysis, and Hazard analysis on new designs.
對(duì)新設(shè)計(jì)進(jìn)行失效模式分析、可靠性分析和風(fēng)險(xiǎn)分析。
The system FMEA needs to go down only to the desired level of detail.
系統(tǒng)式FMEA要向下推展到所需要的細(xì)部層級(jí)。
Knowledge on problem solving skills, be familiar with APQP, PPAP, FMEA is preferred.
有解決問(wèn)題的技巧,熟悉。
According to result analysis of FMEA, Proceeding the reliability design of system key parts and the reliability of increasing experiment.
根據(jù)FMEA分析結(jié)果,進(jìn)行系統(tǒng)關(guān)鍵零件的可靠性設(shè)計(jì)并進(jìn)行可靠性增長(zhǎng)試驗(yàn)。
Basic quality background and knowledge, be familiar with quality process and tools, especially on APQP, FMEA, SPC, 8D.
具備基本的質(zhì)量背景和知識(shí),熟悉質(zhì)量流程和工具,尤其是APQP,F(xiàn)MEA,SPC,8D方面。