NPI project management - coordinate with related function teams to fulfill schedule & cost of mechanical parts development.
新產品專案管理-和不同的團隊合作,一同達成機構料件的開發(fā)時程及成本要求。
Project Description: Company sets up a project management team to follow up product's situation made from NPI to mass production.
項目描述:新項目從開發(fā)階段至產品量產結束,公司成立產品專案管理團隊,直至客人對產品最終確認可量產。
Prepare and deliver presentations to management regarding NPI and BD, manage progress tollgate review and approval process.
負責向管理部門準備及闡述關于NPI及BD的相關報告,負責項目進展中的審核及批準工作。
Qualify new or replacement components; Support Commodity team technically to identify saving opportunity; Support R&D team in NPI.
認證新的或替代的元器件;在技術上支持采購團隊以便確定成本節(jié)約機會;在NPI方面為研發(fā)部提供支持;
Coordinate for problem-solving in operation during NPI phase including materials, production and quality.
領導并協(xié)調解決新產品在營運中出現的任何異常。(包括物料,生產,品質)。
Submit weekly report to NPI Project Leader before local weekly meeting on time, attend weekly meeting to discuss present status.
在每個本地周會前按時提交進展周報,參與周會時討論現在的狀態(tài)。
Participate on weekly project meetings to report the NPI Material status and increase customer satisfaction.
每周項目會議,及時匯報新產品項目物料狀況,提高客戶滿意度。
Working with others establish an effective NPI process and implement effective measures for NPI performance.
同其他人一起建立一個有效的新品導入流程,并有效衡量新品導入的工作表現。
A kind of nonlinear controller nPI is presented and used to correct scanning mirror precise servo system in this paper.
本文給出一種非線性控制器,并將它應用于掃描鏡精密伺服系統(tǒng)的校正。
This use of pieces enables the index pages of an NPI to be spread out into multiple data sets.
通過使用這些小塊,可以使NPI的索引頁散步到多個數據集中。
Using this option improves the performance of scans of the NPI by facilitating parallelism.
通過使用這個選項,可以促進并行性,從而提高NPI的掃描性能。
Setup schedule for all manufacturing preparation task and submit it to NPI Project leader in time at project beginning.
在項目開始的時候設定與制造準備相關任務的計劃時間表,提交給新產品導入領導人。
Direct involvement with production on all Qualification, NPI, and R&D activity related to your strategic account.
直接參與所負責客戶產品的認證、新產品的導入和研發(fā)等項目。
Ensure engineering readiness for assigned Transfer Projects and NPI Projects.
確保分配的轉移及新產品項目工程就緒。
NPI quality control , coordinate with tech department and define quality control point.
新項目質量控制,與技術部門協(xié)調并定義質量控制點。
Work with Sourcing team and NPI team in new product development and specification establishment.
在新產品開發(fā)和建立規(guī)范的工作中和采購團隊,新品導入團隊合作。
Make sure the supplier well controlled, and Grundfos standard introduced to supplier in NPI project.
確保NPI中,供應商有很好的質量控制,供應商了解格蘭富標準;
MOM should allocate Production ME to join in NPI tefeel before pilot run perhaps.
制造部經理應該至多在試坐蓐前分配制造部制造工程師加入新產品導入團隊。
Responsible for NPI, and prepare flow chart , working introduction for each process .
負責新產品的導入,制定生產工藝流程和作業(yè)指導書;
If your NPI is likely to grow significantly, then choose a relatively larger value.
如果NPI極有可能顯著增長,那么應選擇一個更大的值。
Work with NPI Engineer or MOM Manufacturing Engineer on ECO implementation & parts attribute modification during 3 month ramp up.
在三個月爬坡生產期間和新產品工程師或生產部制造工程師一起及時完成ECO執(zhí)行和元件屬性修改。
NPI Project Leader will work on the Project ROI of NPT for Management justification and sign-off when needed.
如果需要,新產品導入項目領導人將為新產品轉移進行投資回報分析報告,供管理層決策并簽署。
Manage the NPI launch process in Xiamen and ensure the delivery of the NPI products per launch plan until 3 month after launch.
引導和控制新項目的導入過程,并確保其準時上市及后續(xù)3個月的及時交貨。
develop new type of integral bathroom product, accomplish the detailed drawings and follow the mass prodution, from NPI to shipment.
研發(fā)新型整體衛(wèi)浴產品,對新產品做出詳細的圖紙并跟蹤工人安裝,從產品準備啟動直到完成負責到底,直到產品運出。
NPI Project leader will integrate their schedule yours license final schedule.
項目領導人將分析悉數的計劃時間表,批準最終的時間表。
Work with R&D for new project. Developing new supplier and ensure NPI schedule launch successfully.
協(xié)同研發(fā)部門新項目開展,尋找并發(fā)展新供應商并保障新項目的順利投產。
Work closely with new product development team both China and US for the NPI activities.
和中國和美國新產品開發(fā)部門緊密合作導入新產品。
Review ECO which is submitted for review, with NPI Engineer or MOM Manufacturing Engineer, and then submit it for approval.
和新產品導入工程師或生產部制造工程師一起審核已經遞交審核的ECO,然后將其遞交批準。
Responsible for the mechanical parts quality activities on NPI and MP stage.
負責結構件在NPI及量產階段的質量行動。
With necessary help and instruction can manage the implementation of NPI project.
在必要的支持和協(xié)助下能完成新項目導入工作。
NPI Project leader will integrate their schedule and approve final schedule.
項目領導人將綜合所有的計劃時間表,批準最終的時間表。
NPI Project Leader will develop NPI Project team with head of cross function department.
新產品導入項目領導人將和各職能部門的領導一起制定和發(fā)展項目團隊。
During this ramp up period, whole NPI team will work together on output target and quality target.
在爬坡量產期間,整個項目團隊將一起達成產量目標和質量目標。
Project Leader will lead the NPI Closure review and submit the wrap-up report to Management.
新產品導入項目領導人將領導NPI結束審核,遞交管理層綜合報告
Contact supplier on yours kinds quality issue during NPI period, push them to solve problem.
在新產品導入期間對待任何部品質量題目干系供應商,推動供應商解決題目。
Participate in test solution development during NPI.
在新產品導入階段參與測試方案開發(fā)。
Implement solution during NPI period and mass production.
在新產品導入期間和大規(guī)模生產期間執(zhí)行解決方案。
Take over product from NPI period to mass production period smoothly.
在量產后從新產品導入部門順利地接收產品。
Release all parts to cell in time according NPD schedule and NPI Project leader's instruction.
根據新產品的生產計劃和新產品項目領導人的指示及時發(fā)放物料到生產線。
Work with whole NPI team on achieving quality target during ramp up build.
和整個新產品導入團隊一起在爬坡生產期間達成質量目標。