tbm
美
英 
英漢解釋
abbr. | 1. (=tactical ballistic missile)戰(zhàn)術(shù)彈道導(dǎo)彈 |
英英解釋
例句
Up to the end of 2008, official sales contracts amounting to 47sets of indigenous TBM had been signed.
截至2008年底,已有47臺國產(chǎn)盾構(gòu)簽訂了正式銷售合同。
The focus of this paper was the integration of the manufacturing TBM information system and the ERP system.
本文的主要工作是在于提出了全面預(yù)算管理信息系統(tǒng)和ERP的集成。
Therefore, open-type TBM construction method in the surrounding rock stability analysis and research on the great practical significance.
因此,對敞開式TBM法施工中的圍巖穩(wěn)定性問題進(jìn)行分析和研究就具有重大的現(xiàn)實意義。
Objective To investigate the cytological features of the cerebrospinal fluid in the clinical diagnosis of the tuberculous meningitis(TBM).
目的探討腦脊液細(xì)胞學(xué)特點在結(jié)核性腦膜腦炎臨床診斷中的價值。
The results may be useful to the construction and expanding excavation of metro station space between existing double TBM tubes.
對研究在已建成地鐵雙隧道間拓展開挖站廳空間的施工具有重要的參考意義。
Research purpose: As a main tool to cut rock, disc cutter was mainly assembled on cutting wheel of TBM, mixed shield and rock shield.
研究目的:盤形滾刀是一種重要破巖刀具,主要用在掘進(jìn)機(TBM)、復(fù)合式盾構(gòu)及巖石盾構(gòu)的刀盤上。
TBM(Tunnel Boring Machine) Cutting Tools Configuration is one of the most important factor during TBM cutting tool design.
盾構(gòu)機刀具配置是盾構(gòu)機刀具設(shè)計中是非常重要的內(nèi)容。
A synthetic evaluation index system for TBM construction risk is established by analyzing the factors that influence TBM construction.
通過深入分析影響TBM施工的風(fēng)險因素,建立了TBM施工風(fēng)險綜合評價指標(biāo)體系。
The planning and implementation of the transportation of the large parts of TBMs are elaborated.
主要闡述盾構(gòu)、TBM大件運輸的策劃和實施過程。
Results The total leucocytes increased in CSF of TBM patients.
結(jié)果結(jié)核性腦膜腦炎患者腦脊液白細(xì)胞總數(shù)升高。
With computational fluid dynamics (CFD) code FLUENT, the actual temperature distribution of key components of HCSB-TBM is simulated.
用流體數(shù)值分析軟件FLUENT模擬了實驗包層模塊關(guān)鍵部件的實際溫度分布狀況。
The joint orientation is a crucial factor which influences the penetration rate of TBM tunneling.
巖體中節(jié)理面與掘進(jìn)方向的夾角是影響TBM破巖速率的一個重要因素。
Therefore, the survey key of excavation line is to control horizontal and vertical deviations of tunnel axis.
因此,TBM掘進(jìn)線路測量關(guān)鍵是控制軸線不發(fā)生橫、豎向偏移。
TBM-6 type blade shape measure Instrument for hydraulic turbine runner and its application were introduced in this paper.
本文介紹了TBM-6型水輪機轉(zhuǎn)輪葉型測繪儀及其應(yīng)用情況。
The steady thermal analysis for the first-wall of CH HCSB TBM module is carried out firstly using the general FE code ANSYS.
利用通用有限元程序ANSYS對中國氦冷固態(tài)氚增殖劑實驗包層模塊(CHHCSBTBM)第一壁進(jìn)行了穩(wěn)態(tài)熱分析。
The research and application of the TBM-6 type blade shape measure Instrument for hydroturbine runner were introduced in this paper.
全面介紹了TBM-6型大型水輪發(fā)電機組水輪機轉(zhuǎn)輪葉型測繪儀的開發(fā)、研制及應(yīng)用情況。
The cutterhead and rock mass characteristics affect the excavation efficiency of full face rock tunnel boring machine (TBM) strongly.
全斷面巖石掘進(jìn)機(TBM)的破巖效率主要受刀盤設(shè)計和巖體特征的影響。
PDS module in ANSYS namely Stochastic FEM, is adopted to predict tunnel deformation and the probability of TBM jamming.
采用ANSYS中PDS模塊即隨機有限元預(yù)測隧道變形量及發(fā)生卡機的風(fēng)險率。
Based on the maximum membership degree criterion of fuzzy mathematics, the rock mass quality of TBM construction could be classified.
這樣,基于模糊數(shù)學(xué)的最大隸屬度準(zhǔn)則,就可以對TBM施工的巖體質(zhì)量進(jìn)行分級。
The paper states the quality control of manufacturing lining segment of tunnel constructed by TBM.
文中論述了TBM施工鋼筋混凝土管片生產(chǎn)質(zhì)量控制。
One tunnel is being constructed by TBM. Its lining adopts precast concrete hexagonal segment.
某隧洞工程采用TBM施工,六邊形預(yù)制鋼筋混凝土管片襯砌。
TO EXCAVATE THE GIANT RING, A TUNNEL BORING MACHINE, OR TBM, WENT UNDERGROUND.
為了挖掘這個巨大的環(huán),一臺大型隧道挖掘機鉆入地下開始挖洞。
Responsible for guarantee issues of TBM project.
負(fù)責(zé)盾構(gòu)機項目的保函事宜。
The damage of medial strength rock by cutters is more remarkable than the high and low strength rock.
TBM滾刀對強度較高或較低巖石的破壞損傷較小,而對中等強度的巖石破壞損傷最為顯著。
For TBM method that is easier to control, construction speed is higher, safety is better then drilling and blasting method.
TBM法與鉆爆法比較的優(yōu)勢在于工序簡單、施工速度快、安全性好。
And this is valuable and has great meaning in the research of penetrating and defending the TBM target.
對研究彈道導(dǎo)彈的防御和突防具有重要的理論意義和參考價值。
Over 2 years working experience in TBM operating, Mix-shield TBM operating is preferred. 3.
2年以上實際設(shè)備操作經(jīng)驗,有泥水盾構(gòu)操作經(jīng)驗者優(yōu)先;
Mountain tunnel construction with high water pressure will apply the tunnel boring machine method (TBM) more and more.
長大深埋高水壓山嶺隧道的施工將越來越多地采用隧道掘進(jìn)機法。
It is significant to study rock fracture mechanism under disc cutters for improvement the value of theoretic and TBM engineering guide.
故對巖石破碎機理進(jìn)行深入研究很有理論價值和工程指導(dǎo)意義。
Risk Identification and Discussion on Emergency Preparedness for Collapse Accident during Metro Construction by Way of TBM
地鐵工程建設(shè)施工危險辨識與施工坍塌事故應(yīng)急預(yù)案的探討
TBM construction scheme for the main horizontal tunnel passing through solution cavity in Taishan mine
塔山礦主平峒TBM過溶洞方案
Study of anti-TBM tactical warning information broadcast net's architecture
反導(dǎo)戰(zhàn)術(shù)預(yù)警信息網(wǎng)的體系結(jié)構(gòu)研究
Discussion on Raising Quality of Lining with Hexagonal Segment Used in Tunnel Constructed by TBM
提高TBM施工隧洞中的六邊形管片襯砌質(zhì)量
Discussion of TBM Construction Technique under Unfavorable Geological Conditions
不良地質(zhì)洞段TBM隧洞施工方法探討
Study of Main Coordinate Systems and Conversion in Anti-TBM Simulation System
反導(dǎo)作戰(zhàn)仿真系統(tǒng)中主要坐標(biāo)系及其參數(shù)轉(zhuǎn)換
Research on Target Orientation Angle Measurement with Wireless Phase Discrimination Method in Anti -TBM Aimed Warhead
反導(dǎo)定向戰(zhàn)斗部目標(biāo)方位無線電比相測角法研究
Consideration on Scheme of TBM Guiding Tunnel and Expanding Excavation in Extra Long Tunnels of Passenger Dedicated Railway Lines
鐵路客運專線特長隧道的TBM導(dǎo)洞擴挖方案構(gòu)想
Technique characters of double shield machine TBM and its application in projects
雙護(hù)盾TBM的技術(shù)特點及工程應(yīng)用
Dust removal ventilation method and its application in TBM construction
TBM施工通風(fēng)除塵方案及應(yīng)用
Analysis on Influence of Excess Under-excavation of Tunnel Constructed by TBM on the Surrounding Rock and Supporting Structure
TBM施工隧道超欠挖對圍巖及支護(hù)結(jié)構(gòu)影響分析