bom
美
英 
- 網(wǎng)絡(luò)物料清單(Bill of Material);材料清單;產(chǎn)品結(jié)構(gòu)
例句
In a way he felt new-bom, like the colt Shem had brought him to see last spring, all shaky legs and curiosity.
他覺得自己仿佛得到了新生,就象去年春天,Shem帶他去看的那只小馬,四肢顫抖,充滿了好奇。
The first BOM you create for a technical object or material has no defined technical category and a simple structure.
為技術(shù)對(duì)象或設(shè)備建立的第一個(gè)物料清單,沒有定義技術(shù)類型和簡(jiǎn)單結(jié)構(gòu),這稱為簡(jiǎn)單BOM。
The structure within the assembly is often used to generate an as-designed bill of material (BOM).
組件里面的結(jié)構(gòu)將被用于產(chǎn)生面向設(shè)計(jì)的BOM。
For a site to be listed in a section of the BOM , the site must also be associated with the parent item .
在BOM列出的站點(diǎn)信息,站點(diǎn)也必須被他的父項(xiàng)目指定。
Build Forge allows you to easily update the adapters used to interact with various systems and repositories in documenting BOM information.
BuildForge可以讓您輕松地更新在對(duì)BOM信息存檔時(shí)用來與各種系統(tǒng)和存儲(chǔ)器相互作用地適配器。
Built and maintain BOM (bill of material) for new product and update it in case of engineering change or other requirement by related dept.
進(jìn)行新產(chǎn)品BOM(物料清單)表的建立與維護(hù),根據(jù)工程變更或相關(guān)部門要求進(jìn)行更新。
The encoding of these changes must be manual, a small explanation can be added to each modification on a BOM.
這個(gè)變化的代碼必須是人工,小的說明能加到每個(gè)BOM修改上。
The BOM contains the translation of the input Java or XML code to the business term used in the rules engine, as shown in Figure 5.
BOM包含將輸入Java或XML代碼轉(zhuǎn)換為規(guī)則引擎中使用的業(yè)務(wù)術(shù)語,如圖5中所示。
At least 5 years working experience on material handle, production schedule, BOM structure, warehouse management, finance knowledge.
5年以上的工作經(jīng)驗(yàn)在物料管理,生產(chǎn)計(jì)劃,倉(cāng)庫(kù)管理及財(cái)務(wù)的知識(shí)。
Captain TT decided to put out nets around two nautical miles offshore from Bom Bay island.
船長(zhǎng)決定將漁網(wǎng)拉到浪花礁約2海里的近岸。
The common section of a BOM can be modified through a revision change only .
這些BOM的普通內(nèi)容只有在版本更改時(shí)可以被編輯。
If all the technical objects are identical in terms of structure, the BOM items are valid for all the allocated technical objects.
如果所有技術(shù)對(duì)象的結(jié)構(gòu)項(xiàng)目都是相同的,那么物料清單項(xiàng)目對(duì)所有已分配技術(shù)對(duì)象都是有效的。
Omit the XML declaration, and use the UTF-8 encoding, or use a UTF-16 Unicode Byte Order Mark (BOM) at the beginning of your document.
在文檔的開頭部分,省略XML聲明,并使用UTF-8編碼,或者使用UTF-16Unicode字節(jié)順序標(biāo)記(ByteOrderMark,BOM)。
The whole process is repeated for the next level in the BOM and so on until the bottom is reached.
整個(gè)過程在BOM的下一個(gè)級(jí)別里再重復(fù),直到到達(dá)底部。
This acts as a "signature" or "byte-order mark (BOM)" to identify the encoding and byte-order used in a file.
這作為一個(gè)“特征符”或“字節(jié)順序標(biāo)記(byte-ordermark,BOM)”來識(shí)別文件中使用的編碼和字節(jié)順序。
New product designs, including information collection, create SWC drawing, deviation approval from customer, BOM and routing in the system.
新產(chǎn)品設(shè)計(jì),涉及技術(shù)信息搜集,創(chuàng)立公司標(biāo)準(zhǔn)圖紙,設(shè)計(jì)偏離的客戶確認(rèn),BOM和工序的系統(tǒng)錄入。
Report to P&M manager the result of stock checking and BOM &YIELD of each product in every month.
每月向生產(chǎn)經(jīng)理匯報(bào)盤點(diǎn)的結(jié)果和每種產(chǎn)品的消耗及收率情況。
develop a high level BOM tree structure and a block diagram of the system design concept.
生成一個(gè)概要的BOM結(jié)構(gòu)樹以及系統(tǒng)設(shè)計(jì)概念塊圖。
The data structure of the product (BOM) can be exported into other systems or into a spreadsheet.
該產(chǎn)品(BOM)的數(shù)據(jù)結(jié)構(gòu)可以輸出到其他系統(tǒng)或到電子表格。
The site section of the BOM can be modified through a revision change or an SCO (site change order) .
BOM的站點(diǎn)內(nèi)容可以被編輯在版本更改時(shí)或者一個(gè)站點(diǎn)變更單。
Since the moment we bom, we communicate in me world of language.
打從我們一出生,便是在語言的世界中交流。
You can directly edit the item object BOM table when an item is initially created and before it is added to the Affected Items of a change.
你可以之間編輯一個(gè)項(xiàng)目對(duì)象BOM表,當(dāng)一個(gè)項(xiàng)目在初始創(chuàng)建和被加到影響項(xiàng)目之前。
Must be able to create BOM and assist on costing.
須具有制備物料清單和協(xié)助進(jìn)行成本計(jì)算的能力。
l Maintain master data of BOM , routing and work center in SAP, to make sure all data at the last version.
在SAP里維護(hù)物料清單,工藝流程和工作中心,確保所有主數(shù)據(jù)在最新版本。
Manual BOM edit are tracked independently and will not be changed upon subsequent BOM publish updates.
手動(dòng)編輯BOM是被單獨(dú)追溯的,不會(huì)更改在后續(xù)的BOM發(fā)行更新時(shí)。
You can use the validated and configured orders as input to produce corresponding Bill of Materials (BOM) in manufacturing nomenclature.
您可以利用這些有效填寫的訂單作為輸入來產(chǎn)生制造術(shù)語中相應(yīng)的BOM。
6Cooperate with finance, tracking item cost changing and discrepancy , verifying BOM accuracy as the case may be.
與財(cái)務(wù)配合,追蹤零件成本變化和差異并視情況查驗(yàn)BOM正確性。
Familiar with BOM structure, sound knowledge on components description, such Resistor, Capacitor, Inductor, IC, etc.
熟悉BOM的構(gòu)成,對(duì)電子元器件種類有充分的了解,如電阻、電容、感應(yīng)器、集成電路等。
In this case, the order of production will be carried out in only once as in a phantom BOM.
在這個(gè)案例中,這生產(chǎn)單將作為一個(gè)虛擬BOM執(zhí)行一次。
BOM's, material requirements in an MRO environment are largely unpredictable.
BOM的,原料需要量在MRO環(huán)境里是主要變化莫測(cè)的。
Some research and developing work about BOM, which is on the base of the research work all over the world is done in this dissertation.
本文在綜合國(guó)內(nèi)外關(guān)于BOM研究的基礎(chǔ)上,對(duì)BOM模型及其設(shè)計(jì)思想的應(yīng)用進(jìn)行了一些研究與開發(fā)工作。
Calculate & submit workload (Man hour or labor cost) before mass production, provide it to BOM maintenance person.
計(jì)算工作負(fù)荷(人工小時(shí),人工成本),提供給BOM維護(hù)人員。
New products, designing problem collection and follow up. Checking new products' BOM and drawings, and finding and updating the problems.
審查新設(shè)備圖紙的生產(chǎn)工藝性,發(fā)現(xiàn)并解決問題。
If the BLOB XML stream contains a byte-order mark (BOM), it is used to determine the assumed code page of the data inside the BLOB.
如果BLOBXML流包含一個(gè)byte-ordermark(BOM),那么可以用它來確定BLOB中的數(shù)據(jù)所設(shè)的代碼頁(yè)。
Next, you can take a look at the Bill of Materials (BOM) reporting and customize it to include the information that is important to you.
接下來,您可以看看資料清單(BOM)報(bào)告并對(duì)它進(jìn)行制定,使其包括您認(rèn)為比較重要的信息。
Review product BOM for accuracy as well as manufacturing cost reduction opportunities.
審查產(chǎn)品BOM的準(zhǔn)確性,審查降低制造成本的機(jī)會(huì)。
Responsible for preparing electrical models, Drawings, BOM, Quotation on the new project and provide technical support to NPD team.
負(fù)責(zé)準(zhǔn)備電器模型,圖紙,BOM,對(duì)新項(xiàng)目組和報(bào)價(jià)組提供技術(shù)支持。
Classes Process-Plan and BOM manipulate information and data associated with process plans and bill of materials, respectively.
加工計(jì)劃、物料清單類巧妙的處理與之相關(guān)的加工計(jì)劃和物料清單的信息和數(shù)據(jù);
I remember the day well, it was the day my second son was bom.
我很清楚地記得那天,那也是我第二個(gè)兒子出生的日子。
For finish product, please submit its BOM list and explosion diagram. Please also provide instruction and package if available.
針對(duì)成品測(cè)試,請(qǐng)提交該產(chǎn)品的物料清單及其機(jī)械爆炸圖。若有使用說明書及產(chǎn)品外包裝,請(qǐng)一并遞交實(shí)驗(yàn)室。