pert.
美 [p?:t]
英 [p?:t] 
英漢雙解
1. | 無禮的;冒失的;輕佻的showing a lack of respect, especially in a cheerful and amusing way |
2. | 小巧玲瓏的;誘人的;硬實的small, firm and attractive |
英漢解釋
英英解釋
例句
The major began to think that Pen was growing exceedingly pert and conceited, and that the upper world made a great deal too much of him.
少校開始覺得,小潘已變得忘乎所以,目空一切,上流社會過分抬舉他了。
Just think about it - pert and perky butt. -It may be too late for me for that. -Never too late.
考慮一下–健康和活躍的臀肌。-對我來說可能太晚了。-絕不會太晚的。
Three point estimation : sometimes referred to as PERT analysis, is a great tool for estimating activity durations.
三點估計:有時候也被稱為PERT分析。這是一個很好的估計活動需時的工具。
'And a fool you look in it, ' cried Diana, his pert sister who was just in her teens.
“你戴上它就象個傻瓜一樣。”迪安娜說。迪安娜是他十幾歲的小妹妹,說話很冒失。
Decide what you want to show, and then choose from the four Visio scheduling diagrams: Timeline, Calendar, Gantt chart, PERT chart.
首先確定要顯示的內容,然后在四個Visio日程圖表中進行選擇:時間線、日歷、甘特圖和PERT圖。
Every ringside witness, every sporting ex- pert, and the whole sporting world, knew there had been no foul.
拳臺邊的每一個人,每一個運動專家,整個體育界,都知道他沒有犯規。
Second, this paper expounds the research program on network planning technology, and focuses on analyzing the PERT network planning.
接著,闡述網絡計劃技術的研究現狀,著重分析PERT網絡計劃技術的應用過程。
The problem of agent capability requirement design is explored from two different aspects: process efficiency and task performance.
在代理能力需求設計問題上,從任務效率和任務性能兩個角度,分別建立了PERT網路圖最優工期模型和非線性規劃模型。
This paper studies the sensitivity of non-critical process in program evaluation and review technique(PERT) network.
本文研究了計劃評審技術(PERT)網絡中非關鍵工序的敏感性問題。
The thesis discusses the application of Monte Carlo simulation method and the PERT scheduling optimization model.
本文的重點是模擬仿真法的應用和PERT進度優化模型。
UPDATED: Was the US president admiring a pert behind?
最新更正:美國總統是身后欣賞的專家嗎?
They'll be introducing Pert Plus for Men Deep Cleansing, Pert Plus for Men Daily Dandruff and Pert Plus for Men Thickening.
他們將引進專家加男士深層清潔,專家加男子每日頭皮屑和專家加男子增厚。
a minor female role as a pert flirtatious lady's maid in a comedy.
喜劇中出演輕浮少婦的侍女的小角色。
Some reports said Luo Lin series last will kill Harley baud this application in his Harley in Pert the boy.
有報道說羅琳將在他的哈利珀特系列的最后一部里殺死哈利波特這個應用的男孩。
Double- click any open space on the PERT Chart to display the Box Styles dialog box, and then click the Boxes tab.
具體做法是:雙擊“統籌圖”空白區域以顯示“方框樣式”對話框,然后選取“方框”選項卡。
surface on which they are pressing while ejecting the pert.
表面上他們是緊迫,噴射的有禮有節。
A pert young woman carrying cameras and equipment came in from outside.
一個活潑的年輕婦女背著照相機和其它設備從外面進來了。
The arrow diagram incorporates PERT in the activity duration .
箭線圖表的工作期中包括。
Then analyze the advantages and disadvantages of the traditional scheduling management method by comparison, such as CPM, PERT.
并對關鍵鏈項目管理方法與傳統的項目管理方法,如關鍵路徑法、計劃評審技術的優勢和劣勢進行了比較。
He was a pert little blonde of about six years.
他是個唐突而漂亮的小孩,大約六歲左右。
First of all, note the reported outcome of the Polaris project and PERT.
首先,注意觀察Polaris項目和PERT圖的產出報告。
We can use PERT to evaluate the probability that the whole project will finish in a certain times.
PERT可以估計整個項目在某個時間內完成的概率。
says the Internet systems maintenance ex-pert.
這位因特網系統維護專家說。
PERT chart shows relationships among tasks and timeframes .
PERT圖顯示任務與時間框架之間的關系。
no, I could not endure William Coxe - a pert young lawyer.
不行,我可受不了威廉·考克斯——一個愣頭愣腦的年輕律師。
says the baldhead , pretty pert and uppish.
禿頭說。話說得相當不客氣。
"I know who it is, " said Mr. Arthur, making rather a pert bow.
“我知道是誰,”亞瑟先生說,不大自然地鞠了一躬。
Because of these differences, PERT is used more in research and development projects.
鑒于這些差別,pert主要應用于研究和發展項目。
mrs . pert and miss newton hang on as usual.
貝特太太和牛頓小姐還是象往常那樣賴著不走。
I was assigned the role of brand assistant to launch Pert 2 in 1[shampoo] in Australia.
我被指派為品牌助理,在澳大利亞推出飄柔二合一洗發水。
Learn how to perform a PERT analysis.
了解如何執行PERT分析。
She is wearing a pert little hat.
她頭戴一頂小巧別致的帽子。
A girl or young woman who is considered pert, flirtatious, or impudent.
冒失或輕佻的女子被認為唐突、輕佻或不謹慎的女孩或年輕女人。
The scary pert is he seems never to get along with anybody.
令人不安的是他似乎從不與任何人交往。
use this view when performing a pert analysis on a task ' s duration or on your project ' s schedule
當對任務工期或項目日程進行pert分析時可使用此視圖。
To view the optimistic, expected, and pessimistic durations, on the PERT Analysis toolbar, click Optimistic Gantt
若要查看樂觀、預期和悲觀工期,請在“PERT分析”工具欄上,單擊“樂觀甘特圖”
Time-resources tradeoffs of PERT construction schedule under resource constraints
資源約束下PERT施工進度計劃的優化
Module 12: Consolidating Projects Insert Recurring Tasks, Create a PERT Overview Chart, Combine Projects, Use Workgroup Features
單元12:項目合并添加定期任務,創建統籌視圖圖表,項目合并,使用工作組
About using a PERT analysis to estimate task durations - Project - Microsoft Office Online
關于使用PERT分析評估任務工期-Project-MicrosoftOfficeOnline
The Application of PERT Imitates True Technique in Engineering Practice
PERT仿真技術在工程實踐中的應用